PS2007, High Availability configuarion

V

Vadim Gerya

Hi All!
Does anybody try to set PS2007 system in "no single point of failure"
configuration?
For example
1) failover DB cluster for SQL 2005
2) 2 application servers
3) 2 front-end servers

Is it possible to get system working if one application or front-end servers
fails ?
Where I can find additional guidelines or technical articles (except MS
Technet ones) ?
Thanks in advance for any help !!
 
B

Ben Howard

Hi Vadim,
Yes, that will work. You'll need to think about clustering Analysis
Services and SRS too. As for information outside of technet, it is thin on
the ground at the moment.
 
V

Vadim Gerya

Thank you Ben as always!
I am going to do clustering for Analysis and Reporting too.
 
V

Vadim Gerya

We have setup high available configuration includes
1) Database SQL 2005 cluster. 2 Nodes with Shared Storage
2) 2 (Aplication-Front_End) Servers
If we shut down any of Database node or Aplication Server system works
correctly.
 