I have installed MOSS and Project Server 2007. When I try to attach an issue
or risk to a Task in its respective Project Workspace, the Link Items button
is missing.
However, in installations where PS2007 is installed without MOSS the Link
Items Button is present.
Is this a bug?
Thanks,
or risk to a Task in its respective Project Workspace, the Link Items button
is missing.
However, in installations where PS2007 is installed without MOSS the Link
Items Button is present.
Is this a bug?