J
Joel P.
MS 2003 SP2a PWA OLAP cube failed last night with the following error:
The cube scheduled to be built on 12/31/2008 at 12:25 AM failed.
(-2146233088) Server: The operation has been cancelled.
I researched, and it sounds like SP3 might fix this, is this the best
solution?
Kind regards,
Joel P.
The cube scheduled to be built on 12/31/2008 at 12:25 AM failed.
(-2146233088) Server: The operation has been cancelled.
I researched, and it sounds like SP3 might fix this, is this the best
solution?
Kind regards,
Joel P.