PWA/Outlook integration-tasks in calendar view

B

Bella

Why is it that when tasks get imported from PWA to the outlook calendar, that
they seem to get randomly assigned to a timeslot. For instance a task that
has a 5 hour duration gets put from 9-1, why not another time slot? Does the
microsoft project server have a method of what timeslot it assigns tasks?
Thanks,
Bella
 
G

Gary L. Chefetz \(MVP\)

Bella:

The times are coming from the Project Plan and reflect the way the project
is scheduled. If you want to change the times, then you'll need to do this
in the Project.

--

Gary L. Chefetz, MVP
"We wrote the books on Project Server"
http://www.msprojectexperts.com

-
 