Hi all
I'm using PWA & Project Server 2003 and have some query on RISk & ISSUE in
Project Web Access 2003
1.) In Risk tab --> Column name ASSIGN TO is lookup and we select only one
resource at a time. Is it possible that we select multiple resource for
assigning at a time.
2.) Column description can be visible same for all risk & Issues or new
created / edited Risk issues.
3.) Is it possible that in Risk --> CLOSE DATE field should be linked with
STATUS filed and when Risk status become “Closed†then Close Date
automatically entered the date on which risk is closed?
4.) How to take print out of existing Risk or Issue from PWA 2003. The only
method is to “export to spreadsheet†then change the layout in excel and take
a printout. Any other method?
5.) In PWA 2003 existing Issue can be automatically shifted in Risk tab
after over of due date.
As I already search on different forums of Microsoft and books, but unable
to find out any solution from them. Please do needful.
I'm using PWA & Project Server 2003 and have some query on RISk & ISSUE in
Project Web Access 2003
1.) In Risk tab --> Column name ASSIGN TO is lookup and we select only one
resource at a time. Is it possible that we select multiple resource for
assigning at a time.
2.) Column description can be visible same for all risk & Issues or new
created / edited Risk issues.
3.) Is it possible that in Risk --> CLOSE DATE field should be linked with
STATUS filed and when Risk status become “Closed†then Close Date
automatically entered the date on which risk is closed?
4.) How to take print out of existing Risk or Issue from PWA 2003. The only
method is to “export to spreadsheet†then change the layout in excel and take
a printout. Any other method?
5.) In PWA 2003 existing Issue can be automatically shifted in Risk tab
after over of due date.
As I already search on different forums of Microsoft and books, but unable