Reassignments from PWA lost MSPS2007

G

Gary Zag

I reasigned tasks from My Tasks in PWA. The tasks showed in My Tasks with a
line through them to show they were reasigned. Later the tasks showed up
again with no line through them. I think the project manager may have had
the project schedule open when I reassigned the tasks and the project manager
republished the schedule the reassignments were lost.

Anyone else have this problem?

Gary
 