Kevin Sprinkel
We develop conceptual cost estimates for schematic design
of buildings. Frequently we have multiple worksheets
(Estimate, Summary, Area, etc.) that have a common header
of five fields. I'd like all but one to get their values
from one authoritative worksheet, but when I enter the
cell reference (by pointing to it), it inserts the cell
reference rather than the value, as in:
=Estimate!B1:B1
There must be a parameter set somewhere but I can't find
it. Anyone know how?
Thanks.
Kevin Sprinkel
Becker & Frondorf
of buildings. Frequently we have multiple worksheets
(Estimate, Summary, Area, etc.) that have a common header
of five fields. I'd like all but one to get their values
from one authoritative worksheet, but when I enter the
cell reference (by pointing to it), it inserts the cell
reference rather than the value, as in:
=Estimate!B1:B1
There must be a parameter set somewhere but I can't find
it. Anyone know how?
Thanks.
Kevin Sprinkel