Is there a simple way of setting predecessors between two different
project files task instead of typing the whole location of the file
path \ ID number.
If I open two project files and keep at the same time by clicking
on Windows--- Arrange All.
I am unable to select two tasks (Task 1 from Project 1 and Task 2
from Project 2) by holding the control key down and link it by
clicking it on "Link Task" from the tool bar.
Thank You
Regards,
Sathish
Is there a simple way of setting predecessors between two different
project files task instead of typing the whole location of the file
path \ ID number.
If I open two project files and keep at the same time by clicking
on Windows--- Arrange All.
I am unable to select two tasks (Task 1 from Project 1 and Task 2
from Project 2) by holding the control key down and link it by
clicking it on "Link Task" from the tool bar.