S
sam_n99
My customer need to convert the old system that built on Progress DB to
InfoPath and SPS 2003.
I have to build an InfoPath form to carrying the DB stucture, but the
problem is that each form (Maste) has to refernce multiple forms
(Secondary) in the same Form Library in SPS, I do that by refernce
other form by URL and I have import many fields to the master form. but
when any form (Secodary) edited, then my master form will carry an old
data, and inconsistant data will be bring.
How I can update the master form with last data when I edit some
secondary (reference) forms?
InfoPath and SPS 2003.
I have to build an InfoPath form to carrying the DB stucture, but the
problem is that each form (Maste) has to refernce multiple forms
(Secondary) in the same Form Library in SPS, I do that by refernce
other form by URL and I have import many fields to the master form. but
when any form (Secodary) edited, then my master form will carry an old
data, and inconsistant data will be bring.
How I can update the master form with last data when I edit some
secondary (reference) forms?