I
ITPM
I have a manager that created a schedule and assigned resources at the
Summary Task level (big no no in my opinion). Actuals have been logged to
that summary task, and all of the dependent task work rolled up.
Is there a way to remove actuals from a project, perhaps through PWA? Is it
as simple as having the resources go into their Task Sheet and modifying
their hours and re-submitting?
Thanks
Summary Task level (big no no in my opinion). Actuals have been logged to
that summary task, and all of the dependent task work rolled up.
Is there a way to remove actuals from a project, perhaps through PWA? Is it
as simple as having the resources go into their Task Sheet and modifying
their hours and re-submitting?
Thanks