Replace Timeline Interval Dates with Duration (# of Days)

A

AC

Hello,
I have a bracket interval on a timeline and would like to replace the
date range the text shape shows (based on the IntervalBegin and
IntervalEnd dates) with a duration. For example, if the interval
shows
6.9.08-6.14.08, I would the text shape to show "5 days" instead of
the
dates. Is that possible? If so, how can I make it work?

In addition, is it possible to delete a custom formula in the field
dialog box?


All help is greatly appreciated.
Thanks in advance.
Regards,
Antje Crawford
 
A

AlEdlund

unfortunately those fields are hard-coded into the shape (it's a group shape
with separate text shapes in it). To get what you want you would need to
reengineer the shape.
al
 
P

Paul Herber

Hello,
I have a bracket interval on a timeline and would like to replace the
date range the text shape shows (based on the IntervalBegin and
IntervalEnd dates) with a duration. For example, if the interval
shows
6.9.08-6.14.08, I would the text shape to show "5 days" instead of
the
dates. Is that possible? If so, how can I make it work?

In addition, is it possible to delete a custom formula in the field
dialog box?

Answered in the shapesheet group.
 

Ask a Question

Want to reply to this thread or ask your own question?

You'll need to choose a username for the site, which only take a couple of moments. After that, you can post your question and our members will help you out.

Ask a Question

Top