Hello,
I have a bracket interval on a timeline and would like to replace the
date range the text shape shows (based on the IntervalBegin and
IntervalEnd dates) with a duration. For example, if the interval
shows
6.9.08-6.14.08, I would the text shape to show "5 days" instead of
the
dates. Is that possible? If so, how can I make it work?
In addition, is it possible to delete a custom formula in the field
dialog box?
All help is greatly appreciated.
Thanks in advance.
Regards,
Antje Crawford
I have a bracket interval on a timeline and would like to replace the
date range the text shape shows (based on the IntervalBegin and
IntervalEnd dates) with a duration. For example, if the interval
shows
6.9.08-6.14.08, I would the text shape to show "5 days" instead of
the
dates. Is that possible? If so, how can I make it work?
In addition, is it possible to delete a custom formula in the field
dialog box?
All help is greatly appreciated.
Thanks in advance.
Regards,
Antje Crawford