We are a door manufacturing company and every door order we receive goes into
a MS Project Template to help the PM track the different steps the job has to
go through all the way to shipping the doors. We have 4 PM's in our company
and each one has different kinds of door jobs. In a single quarter we can
have as many as 150 - 200 MS Project files.
Can we write macros, or something, to get reports to help us evaluate these
jobs on schedule and costs on all 150 - 200 jobs at one time. We have a IT
person working for us that has SQL background, so I think she can do all the
programming. I just want to know if it is possible to run a single macro on
all 150 200 jobs.
Thanks
Just needing a bit of information to make sure I can run a report
a MS Project Template to help the PM track the different steps the job has to
go through all the way to shipping the doors. We have 4 PM's in our company
and each one has different kinds of door jobs. In a single quarter we can
have as many as 150 - 200 MS Project files.
Can we write macros, or something, to get reports to help us evaluate these
jobs on schedule and costs on all 150 - 200 jobs at one time. We have a IT
person working for us that has SQL background, so I think she can do all the
programming. I just want to know if it is possible to run a single macro on
all 150 200 jobs.
Thanks
Just needing a bit of information to make sure I can run a report