Hi hope someone has an answer for this issue.
We are on SP2/Aug09 CU.
We have plans that after a save and publish the resouces and their
assignments disappear from the schedule. These are mature schedules.
On some of them it has been up to half the resources.
One of the processes we use is to save a copy locally before we save
and publish; can this cause the problem?