Hi, at the moment a task is assigned to a resource(s)
How can I change my setup that tasks are assigned to Groups, Ie
Project Manager, Engineer etc
This means as a resource I belong to a Engineer Group, any resource in
this group can see the tasks assigned to
the group and can then I can time in there timesheet to this task.
is this possible, do I work with generic resources, im not to sure how
to do it?
thanks
How can I change my setup that tasks are assigned to Groups, Ie
Project Manager, Engineer etc
This means as a resource I belong to a Engineer Group, any resource in
this group can see the tasks assigned to
the group and can then I can time in there timesheet to this task.
is this possible, do I work with generic resources, im not to sure how
to do it?
thanks