Hi,
I have Project Server 2003.
I have a question about resources:
For example, I have 3 projects with 1 resource.
I want to assign him to Gantt 1 20%, Gantt 2 20%, and Gantt 3 60%.
At Gantt 1 he has 3 tasks without link between them. the same at the other
gantts, all of them are at the same time.
Now I want to level the resource. How do I make sure that tasks will
schedule for Gantt 1 at max. 20% units and
not parallelly ?
Thanks
P.