J
Jayalakshmi
How can I get the % allocation for the different resource groups?
For eg: I am having S/W Engineers, Mechanical Engineer...(Resource Groups)
I need to find a way to look at the allocation of e.g. all software
engineers globally.
How should this be done?
----------------
This post is a suggestion for Microsoft, and Microsoft responds to the
suggestions with the most votes. To vote for this suggestion, click the "I
Agree" button in the message pane. If you do not see the button, follow this
link to open the suggestion in the Microsoft Web-based Newsreader and then
click "I Agree" in the message pane.
http://www.microsoft.com/office/com...eaacdf1ad2&dg=microsoft.public.project.server
For eg: I am having S/W Engineers, Mechanical Engineer...(Resource Groups)
I need to find a way to look at the allocation of e.g. all software
engineers globally.
How should this be done?
----------------
This post is a suggestion for Microsoft, and Microsoft responds to the
suggestions with the most votes. To vote for this suggestion, click the "I
Agree" button in the message pane. If you do not see the button, follow this
link to open the suggestion in the Microsoft Web-based Newsreader and then
click "I Agree" in the message pane.
http://www.microsoft.com/office/com...eaacdf1ad2&dg=microsoft.public.project.server