Hi
I’m using MSP 2003 and presently facing a problem with my project plan.
Accidentally resources are removed from my project plan (which is associated
in my project plan). Now project plan is at 89% completion and all the
resource logged there efforts too. Resources actual work is still there in
plan but resources are not display in resource sheet and build team from
enterprise option.
I don’t know how to recover that plan as same as previous position. As I
already try the Restore single project recovery tool (RestoreP.exe) with the
help of Disaster recovery guide but not success.
Can any body provide me the solution with some easy steps?
Thanks in Advance
I’m using MSP 2003 and presently facing a problem with my project plan.
Accidentally resources are removed from my project plan (which is associated
in my project plan). Now project plan is at 89% completion and all the
resource logged there efforts too. Resources actual work is still there in
plan but resources are not display in resource sheet and build team from
enterprise option.
I don’t know how to recover that plan as same as previous position. As I
already try the Restore single project recovery tool (RestoreP.exe) with the
help of Disaster recovery guide but not success.
Can any body provide me the solution with some easy steps?
Thanks in Advance