S
Sunshine
I use a nursing schedule that shows all nursing staff's schedule for a whole
month. This is referred to as the master schedule.
From this schedule I need to be able to identify specific staff scheduled to
work on a specific day during a specific shift on a daily basis in a separate
worksheet.
So if the master schedule is:
A1 A2 A3 A4
April 1, 2008 April 2, 2008 April 3, 2008
NAME SHIFT SHIFT SHIFT
Debbie 7-3 7-3 Off
Trina 3-11 7-3 7-3
Sherry 7-3 Off 7-3
Lisa 3-11 3-11 3-11
Lewis 7-3 3-11 3-11
Paula Off 7-3 3-11
Sharon 11-7 11-7 11-7
I need a daily schedule for April 1. If I put in that date, it will return
everyone working that day and segregate it by shift. So everyone who is
working 7-3 on April 1 in the first 3 rows, 3-11 the next 3 and ll-7.
month. This is referred to as the master schedule.
From this schedule I need to be able to identify specific staff scheduled to
work on a specific day during a specific shift on a daily basis in a separate
worksheet.
So if the master schedule is:
A1 A2 A3 A4
April 1, 2008 April 2, 2008 April 3, 2008
NAME SHIFT SHIFT SHIFT
Debbie 7-3 7-3 Off
Trina 3-11 7-3 7-3
Sherry 7-3 Off 7-3
Lisa 3-11 3-11 3-11
Lewis 7-3 3-11 3-11
Paula Off 7-3 3-11
Sharon 11-7 11-7 11-7
I need a daily schedule for April 1. If I put in that date, it will return
everyone working that day and segregate it by shift. So everyone who is
working 7-3 on April 1 in the first 3 rows, 3-11 the next 3 and ll-7.