P
Peter Dunn
We have Project Server 2007 with SP1 installed but no other hotfixes.
I have been reviewing the posts on the experiences forum members have been
having with the recent Infrastructure Update and want to ask for general
feedback about whether people have found this to be robust enough to install
as we want to get access to the improved My Task functionality (principally
the exposure of the timephased grid within this view). Thoughts?
I have been reviewing the posts on the experiences forum members have been
having with the recent Infrastructure Update and want to ask for general
feedback about whether people have found this to be robust enough to install
as we want to get access to the improved My Task functionality (principally
the exposure of the timephased grid within this view). Thoughts?