I have created a large master project with a number of sub projects.
I have several custom cost fields that I have rolled up to 'Sum'.
Everytime that I open the master project, roll up value on the custom fields
appears as an error. I manually am able to correct this by selecting the
column customizing the roll up to display maximum and then customizing the
column for a second time changing the roll up to Sum.
How can I correct this problem?
I have several custom cost fields that I have rolled up to 'Sum'.
Everytime that I open the master project, roll up value on the custom fields
appears as an error. I manually am able to correct this by selecting the
column customizing the roll up to display maximum and then customizing the
column for a second time changing the roll up to Sum.