In Project 2002, when I look at the Resource Usage view and do a roll-up
(sorted by groups) I see totals at the roll-up level (for each group).
However, when a co-worker looks at the same view in Project 2000 they don't
see the totals at the roll-up level, only below. So they have to copy and
past into Excel to do totals. Is there anyway to do this in 2000, or is it a
feature only available in 2002?
Many thanks,
Troy