I Have an integrated plan with "linked" sub-projects. How do I then save a
copy of the Intergrated plan which will contain a full copy of the linked
plans? NB. The key point here is that I must keep the links in the original
Intergrated plan so inserting sub-projects and clearing the "link to project"
tick box will not help.