Running the schedule comparison report for two projects from the same user - so it will be the same settings.
I get the following message:
"The duration you entered isn't supported for this field. type a duration in the standard format (such as 4 hours or 12d)"
I've tried changing the duration suffix to 'd' in the settings on both - and still the same.
Any suggestions for things i can try?
I get the following message:
"The duration you entered isn't supported for this field. type a duration in the standard format (such as 4 hours or 12d)"
I've tried changing the duration suffix to 'd' in the settings on both - and still the same.
Any suggestions for things i can try?