TheWall
Hi, I need to find out why my Project 2007 Scheduled backup does not run?
Where can i check the logs or get a idea what is happening. I am talking
about the Functionality under "Server Settings" -> "Database Administration"
-> "Schedule Backup"
Where can i check the logs or get a idea what is happening. I am talking
about the Functionality under "Server Settings" -> "Database Administration"
-> "Schedule Backup"