Just wondering if anyone else has seen this. I've been able to recreat
this problem on 3 seperate installs of OL.
In OL2003, viewing the calendar as a workweek. In the left pane wher
the dates are, select a week, hold shift to drag out more days and dra
off the edge of the "mini calendar" I tend to do this fairly ofte
just because I'm used to dragging things when I'm in a hurry. Pleas
let me know if you've seen this, can recreate it, have any solutions.
Thanks
this problem on 3 seperate installs of OL.
In OL2003, viewing the calendar as a workweek. In the left pane wher
the dates are, select a week, hold shift to drag out more days and dra
off the edge of the "mini calendar" I tend to do this fairly ofte
just because I'm used to dragging things when I'm in a hurry. Pleas
let me know if you've seen this, can recreate it, have any solutions.
Thanks