W
WillTheBuilder
I am trying to sort a build schedule into a sequence using an Access 2007
Form. I 5 have products, A, B, C, D, and E. I enter incoming orders into
a Table with a model field (A-E) and a date field (the date is the day I will
build). Products have to be built in alphabetical order. If i want to build
3 of each in a day, can my access form sort my sequence to look like
A,B,C,D,E,A,B,C,D,E,A,B,C,D,E? Right now I can only sort alphabetically,
AAA,BBB,CCC,DDD,EEE.
Form. I 5 have products, A, B, C, D, and E. I enter incoming orders into
a Table with a model field (A-E) and a date field (the date is the day I will
build). Products have to be built in alphabetical order. If i want to build
3 of each in a day, can my access form sort my sequence to look like
A,B,C,D,E,A,B,C,D,E,A,B,C,D,E? Right now I can only sort alphabetically,
AAA,BBB,CCC,DDD,EEE.