We use Project 03 with PS03 in production, and I'm starting to experiment
with PS07, so I have both Project 03 and Project 07 installed on my PC (PS07
is on a separate dedicated server). Certain PS07 features, such as editing
the standard enterprise calendar, complain that I need to have Project 07
installed and then try to launch Project 03, which of course doesn't work.
Each client is configured to point to the correct server, and the PS07 client
can successfully publish a project. Any ideas? (Other than uninstalling
Project 03, which is still our production version). Thanks.
with PS07, so I have both Project 03 and Project 07 installed on my PC (PS07
is on a separate dedicated server). Certain PS07 features, such as editing
the standard enterprise calendar, complain that I need to have Project 07
installed and then try to launch Project 03, which of course doesn't work.
Each client is configured to point to the correct server, and the PS07 client
can successfully publish a project. Any ideas? (Other than uninstalling
Project 03, which is still our production version). Thanks.