S
SheriTingle
I am using Project 2003 Enterprise Edition. My question is about the
calendars. When I have saved my project on my C drive, without the server
features I can only use the Project Calendar installed with Project stand
alone. When I am on the server I can only use the Enterprise Calendar. Are
those the only options? When I'm on the server I'd like to be able to access
the calendar options I have when I'm in the stand alone (not logged onto the
server) version of Project. Is that possible?
Thanks
calendars. When I have saved my project on my C drive, without the server
features I can only use the Project Calendar installed with Project stand
alone. When I am on the server I can only use the Enterprise Calendar. Are
those the only options? When I'm on the server I'd like to be able to access
the calendar options I have when I'm in the stand alone (not logged onto the
server) version of Project. Is that possible?
Thanks