Is there a way to set a skill-level multiplier for resources such that
Resource A is 15% faster than resource B? I know this is fairly
granular and subjective (everyone can do different tasks at different
speeds), but I need a way to indicate that different resources are
overall faster or slower than others.
I envision entering Duration A, which how long an average resource
would take to get a task done. Then, if Resource B is 15% slower than
average, the actual duration for the task as assigned to Resource B
would be Duration A * 1.15.
Is there a way to do this? The only advice I've seen so far is a
complex macro. Tx.
Resource A is 15% faster than resource B? I know this is fairly
granular and subjective (everyone can do different tasks at different
speeds), but I need a way to indicate that different resources are
overall faster or slower than others.
I envision entering Duration A, which how long an average resource
would take to get a task done. Then, if Resource B is 15% slower than
average, the actual duration for the task as assigned to Resource B
would be Duration A * 1.15.
Is there a way to do this? The only advice I've seen so far is a
complex macro. Tx.