I am having a heck of a time setting up my RBS structure set up. I
entered the RBS structure, saved the Global Enterprise MPP. Closed out
of MS Project. Opened MS Project back up again, and a lot of the
lowest level RBS structure wasn't there. Or a next level summary had
several subordinates that shouldn't have been there.
Any Ideas?