T
tt
forum,
I am trying to setup a new msproject2002 server on one
machine with another machine that I just installed sql
2000 server. Do I have to do anything special to the sql
server before installing msproject on the other machine?
When I try to do the install on the msproject machine it
fails to create a database on the other machine running
sql server using the gui. Saying I don't have sysadmin or
dbcreate permissions. when i try to do it from the command
line using setupdb I get either failed to login or failed
to create a connection [named pipes] does anyone have any
ideas what could be causing this and can I run the sql on
another box starting from scratch or must there be
something special done son the sql server? thank so much
for all replies
I am trying to setup a new msproject2002 server on one
machine with another machine that I just installed sql
2000 server. Do I have to do anything special to the sql
server before installing msproject on the other machine?
When I try to do the install on the msproject machine it
fails to create a database on the other machine running
sql server using the gui. Saying I don't have sysadmin or
dbcreate permissions. when i try to do it from the command
line using setupdb I get either failed to login or failed
to create a connection [named pipes] does anyone have any
ideas what could be causing this and can I run the sql on
another box starting from scratch or must there be
something special done son the sql server? thank so much
for all replies