T
Tally38
Hello,
I have a master pipeline and in the Status column there will be term
such as "closed", "approved", "pending", etc. I also have additiona
worksheets in the same workbook titled "closed", "approved", "pending"
etc. I want to be able to look at the master pipeline and see everythin
that was input and have the "closed" rows copied to the "closed
worksheet, the "approved" copied to the "approved" worksheet, etc. Ho
can I do that
I have a master pipeline and in the Status column there will be term
such as "closed", "approved", "pending", etc. I also have additiona
worksheets in the same workbook titled "closed", "approved", "pending"
etc. I want to be able to look at the master pipeline and see everythin
that was input and have the "closed" rows copied to the "closed
worksheet, the "approved" copied to the "approved" worksheet, etc. Ho
can I do that