There is another problem. When I have a task that
requires 80 hours of work, and I assign 10 people from
the day shift, I get each person doing 8 hrs of work.
But if I assign 4 guys from the day shift and 3 guys from
the swing shift and 3 guys from the swing shift, I get un
equal hours of work for them to do.
Why?
Thanks,
Dave