J
John Dough
I thought this would be simple and obvious -- what am I missing?
Have 2 columns -- col A is the date; col B is the value
Want to make a line chart that plots the values over time.
When I use the chart wizard I can only get a chart that puts in default date
values (starting with 1/1/00). I cannot find a way to get the data from my
date column into the chart. The help file is no help. I am flabbergasted
that something which should be so simple is stumping me!
Have 2 columns -- col A is the date; col B is the value
Want to make a line chart that plots the values over time.
When I use the chart wizard I can only get a chart that puts in default date
values (starting with 1/1/00). I cannot find a way to get the data from my
date column into the chart. The help file is no help. I am flabbergasted
that something which should be so simple is stumping me!