M
Mark
Hi:
I've got 2 masters, triangle and square, both of which have a user
defined cell, "riskCount" created in their master pages ShapeSheet
(i.e., not the ShapeSheet associated with the actual shape, but with
the page) - this is used to hold the current count of triangles and
squares on the page.
When I drop one of the shapes to the drawing page, the "riskCount" row
gets copied to the drawing page, as expected.
However, when I drop the other shape down, "riskCount_2" gets created.
According to the docs, Visio should only bring along items from the
master shapesheets that it doesn't already have on the drawing page.
I don't understand why the second instance of riskCount is being
created, when one already exists.
How do I prevent this? I just want a single "riskCount" on the active
drawing page, in order to keep a total count of all triangles and
squares shapes.
Thanks,
Mark
I've got 2 masters, triangle and square, both of which have a user
defined cell, "riskCount" created in their master pages ShapeSheet
(i.e., not the ShapeSheet associated with the actual shape, but with
the page) - this is used to hold the current count of triangles and
squares on the page.
When I drop one of the shapes to the drawing page, the "riskCount" row
gets copied to the drawing page, as expected.
However, when I drop the other shape down, "riskCount_2" gets created.
According to the docs, Visio should only bring along items from the
master shapesheets that it doesn't already have on the drawing page.
I don't understand why the second instance of riskCount is being
created, when one already exists.
How do I prevent this? I just want a single "riskCount" on the active
drawing page, in order to keep a total count of all triangles and
squares shapes.
Thanks,
Mark