M
Mona
Thanks in advance!
Data
A B C D E
1/2/2009 3 1 3 2
1/3/2009 2 5 2 6
1/4/2009 1 3 1 3
If column A=1/3/2009 then add column C + column E. Thanks a bunch
Data
A B C D E
1/2/2009 3 1 3 2
1/3/2009 2 5 2 6
1/4/2009 1 3 1 3
If column A=1/3/2009 then add column C + column E. Thanks a bunch