How do I generate a report that gives me hours assigned to each resource in a
wbs element with a summary of each resource at the top level wbs. So, I have
programmer, engineer assgined hours on wbs 1, wbs2 and wbs 4. I want to see
total hours for each resource for each top level wbs.
wbs element with a summary of each resource at the top level wbs. So, I have
programmer, engineer assgined hours on wbs 1, wbs2 and wbs 4. I want to see