Hi guys,

I discovered a possible synchronization problem between Project Prof.
2003 and the Web Project Center.
I am not sure if it is not only a switch that is set/not set, because
this a set-up in a company which is testing the whole environment, here
at home everything works. OK, enough introduction the problem goes like
this:

I have an enterprise resource pool established, from which I build a new
enterprise team designated to a project. I am now able to check out the
resource pool for this project in Project Prof. 2003, reduce e.g. the
availability for a person to 50%, and save the whole stuff (i.e. check in
the resource pool), closing Project Prof. 2003. Now opening the resource
pool (or better viewing) in the Web Project Center does not show the
latest actions, that is the availability of the person with 50%.

As I said, at home it works, in the company not. Any hints where to look
for? In the company the have moved the SQL-Database with the SQL
migration tool on a different server, but ran the ODBC tool against it,
etc. Is this a possible reason?

Thanks
Henry
 
G

Gary L. Chefetz \(MVP\)

Henry:

The problem you describe above could be related to this as well. Perhaps
your problem is rights on the ViewDrop folder. There's not pat answer I can
give you, but your system is not configured correctly.

--

Gary L. Chefetz, MVP
"We wrote the book on Project Server
http://www.msprojectexperts.com

-
 
H

Henry

Thanks Gary,

I need more time to investigate the envirionment in the company, what
differs in some way to mine at home.