[QUOTE="Henry, post: 4928934"] Hi guys, I discovered a possible synchronization problem between Project Prof. 2003 and the Web Project Center. I am not sure if it is not only a switch that is set/not set, because this a set-up in a company which is testing the whole environment, here at home everything works. OK, enough introduction the problem goes like this: I have an enterprise resource pool established, from which I build a new enterprise team designated to a project. I am now able to check out the resource pool for this project in Project Prof. 2003, reduce e.g. the availability for a person to 50%, and save the whole stuff (i.e. check in the resource pool), closing Project Prof. 2003. Now opening the resource pool (or better viewing) in the Web Project Center does not show the latest actions, that is the availability of the person with 50%. As I said, at home it works, in the company not. Any hints where to look for? In the company the have moved the SQL-Database with the SQL migration tool on a different server, but ran the ODBC tool against it, etc. Is this a possible reason? Thanks Henry [/QUOTE]
Verification
Post reply
Forums
Archive
Newsgroup Archive
Project Newsgroups
Project Server
Synchronization Problems?
Top