Using Project Server 2007 SP1. I have some enterprise tasks fields that are
configured to roll to the assignments. These fields are added to the
timesheet view. In MS Project the fields show that they get rolled down to
the assignment. The values these fields do not show up in the timesheet.
The do show if a value is entered manually in the assignment but not if they
are just entered in the task. Any help?
Thanks