Prasanna Adavi, PMP, MCTS
We are currently running MSPS 2007 with WSS 3.0. I am trying to create a list in one of the project work spaces. I would like to auto-populate two columns in that list with the start and end date of certain tasks from the Project Plan in MS project. I am thinking we can do this by linking these columns to the the project SQL database fields. So,
1) Do I use the published SQL databse for this?
2) Which fields in the SQL database would I have to link to get the Start and End dates?
EggHeadCafe - Software Developer Portal of Choice
AutoList in ASP.Net
http://www.eggheadcafe.com/tutorial...eda-bbdd-609a6a6fd120/autolist-in-aspnet.aspx
1) Do I use the published SQL databse for this?
2) Which fields in the SQL database would I have to link to get the Start and End dates?
EggHeadCafe - Software Developer Portal of Choice
AutoList in ASP.Net
http://www.eggheadcafe.com/tutorial...eda-bbdd-609a6a6fd120/autolist-in-aspnet.aspx