Task Templates

B

BCTulsan

I've entered several specific types of pipe as material resources. I
currently have milestones set up under each task which correspond to the
dates at which the pipe will be installed. For distant future tasks (outside
of 6 months), the pipe type, amount, and install dates are fairly consistent
based on location. Is there a way besides a macro that I can standardize
this information by location? Thanks!
 