L
Leadfoot
(Project 2007 Standard)
We track our time on projects on a bi-weekly basis.
When looking at the task usage, and I choose to show the bottom tier in
weeks with a count of two, I need to have the dates be the other week. e.g.
Our time periods would start Saturday October 4th and go through Friday
October 17th. However, the Task Usage shows the beginning of the pd as
Saturday October 11th.
What setting do I change so that the period would start on the "other" week.
Thanks
We track our time on projects on a bi-weekly basis.
When looking at the task usage, and I choose to show the bottom tier in
weeks with a count of two, I need to have the dates be the other week. e.g.
Our time periods would start Saturday October 4th and go through Friday
October 17th. However, the Task Usage shows the beginning of the pd as
Saturday October 11th.
What setting do I change so that the period would start on the "other" week.
Thanks