I have a problem with tieing tasks together.I have
several summary tasks,each of them has a set of common
subtasks which are internally chained.This way the poject
may finish soon but the related subtasks are not done
joined to each other,and so the summary task takes long
and the duration is much more than the work,and besides I
want the related sub tasks be done serial.
As this is my urgent need,I will be very pleased if you
kindly respond me ASAP.
Thanks.
several summary tasks,each of them has a set of common
subtasks which are internally chained.This way the poject
may finish soon but the related subtasks are not done
joined to each other,and so the summary task takes long
and the duration is much more than the work,and besides I
want the related sub tasks be done serial.
As this is my urgent need,I will be very pleased if you