Time based on constraints

M

MrsJparty

Is there a way to calculate time based on 16 hour days.
I'm tracking machine downtime. Shift hours are 6am - 2:30
and 2:30 - 10pm. Machine goes down on Friday 10am and
back up and running on Monday 11am. Based on 16 hour day,
how long was that machine down?

Thanks
 