T
TK Vanacoro
I must be having a brain-dead day.
How do I restrict the time increments resources can report in PWA ? I want
to lock them down to a tenth (2.4 hr) and no lower (not allow 2.45hr).
Thanks
How do I restrict the time increments resources can report in PWA ? I want
to lock them down to a tenth (2.4 hr) and no lower (not allow 2.45hr).
Thanks