K
Klaus Schuerkamp
Subject: dynamic timeline 4/16/2004 3:31 PM PST
By: Klaus Schuerkamp (search by author) In: microsoft.public.office.developer.vba
I want to make a timeline that is dynamic. I work with events that are planned for the future, but does not follow a 24hr/day rate of time (usage may be 18hrs/ day but may vary), and I would like it to update automatically. I'm using an hour meter to measure the rate of usage in a time period and I would like to be able to enter hour meter readings and have the timeline update with an entry of a new
By: Klaus Schuerkamp (search by author) In: microsoft.public.office.developer.vba
I want to make a timeline that is dynamic. I work with events that are planned for the future, but does not follow a 24hr/day rate of time (usage may be 18hrs/ day but may vary), and I would like it to update automatically. I'm using an hour meter to measure the rate of usage in a time period and I would like to be able to enter hour meter readings and have the timeline update with an entry of a new