hi all.
i'm hoping someone can point me in the right direction. i'm trying to
make a scheduling system in our office using access 2003 but i'm having
trouble figuring out how to make a core part of the interface. i need
to make a custom calendar (i guess you'd call it) that's in a
horizontal timeline format. i found a screenshot of something similar
but i can't figure out how it was done. i'm only trying to show the
month/year across the top and a grid for each week within each month.
i'm not interested in the color, etc of the screenshot. users will
enter a number into each grid cell representing how many hours they're
expecting to work. i hope that makes sense. any help will be greatly
appreciated. i don't necessarily need code snippets. i just can't find
a form control that i can change the column spans, etc of the grid (see
screenshot). Thanks. Mark
http://www.retreattracker.com/LodgingAvailability.jpg
i'm hoping someone can point me in the right direction. i'm trying to
make a scheduling system in our office using access 2003 but i'm having
trouble figuring out how to make a core part of the interface. i need
to make a custom calendar (i guess you'd call it) that's in a
horizontal timeline format. i found a screenshot of something similar
but i can't figure out how it was done. i'm only trying to show the
month/year across the top and a grid for each week within each month.
i'm not interested in the color, etc of the screenshot. users will
enter a number into each grid cell representing how many hours they're
expecting to work. i hope that makes sense. any help will be greatly
appreciated. i don't necessarily need code snippets. i just can't find
a form control that i can change the column spans, etc of the grid (see
screenshot). Thanks. Mark
http://www.retreattracker.com/LodgingAvailability.jpg