Hi,
I have to rent an office on a month to month basis for a project. On the
first of every month, I will incur the same cost. In the last month, I will
incur the same cost whether the project ends on the 4th or the 30th of the
month. How do I track this in MSP?
Thanks in advance.
I have to rent an office on a month to month basis for a project. On the
first of every month, I will incur the same cost. In the last month, I will
incur the same cost whether the project ends on the 4th or the 30th of the
month. How do I track this in MSP?