I am currently using an Access Database for Project Management. People are
able to select projects and look up various bits of information. I am trying
to incorporate something in the database that works like Microsoft Project. I
want to be able to show a visual representation of the tasks going on. Each
task has a start and end date. I would love to show a calendar of ongoing
tasks. Each task would be a different color and the entire lifespan of the
project would be shown.
For Example:
Project Start End
Project1 5/5/09 5/31/09
Project2 5/15/09 5/31/09
The calendar would show the dates 5/5/09 through 5/31/09 in, let’s say, red
and 5/15/09 through 5/31/09 in blue. The days that overlap would show both
colors.
Can anyone advise me where to go? Is there a control to get for this? I
would like to avoid getting Microsoft Project.
Thanks
able to select projects and look up various bits of information. I am trying
to incorporate something in the database that works like Microsoft Project. I
want to be able to show a visual representation of the tasks going on. Each
task has a start and end date. I would love to show a calendar of ongoing
tasks. Each task would be a different color and the entire lifespan of the
project would be shown.
For Example:
Project Start End
Project1 5/5/09 5/31/09
Project2 5/15/09 5/31/09
The calendar would show the dates 5/5/09 through 5/31/09 in, let’s say, red
and 5/15/09 through 5/31/09 in blue. The days that overlap would show both
colors.
Can anyone advise me where to go? Is there a control to get for this? I
would like to avoid getting Microsoft Project.
Thanks